General
Sami, Ayacucho dept., 27,000 has previously Barrick.

Sumaq, Ayacucho dept., 9000 has previously Anglo-Ashanti.

Additional 3,700 ha Option "Minera Peñoles del Peru S.A." ("Peñoles")

Tertiary volcanic rocks belt; High sulfidation and possible low sulfidation targets.

Exploration Works
Sami, 1:5,000 geological mapping and litho geochemical sampling.

Sami, IP ground geophysical surveying; not in possession of the IP data.

Sami ,Seven drill holes totaling 1,338.3 m. were drilled on two claim blocks (3 drill holes each)
- Holes BDSE 01 to 03 = 663.6 m and,
- Holes BDL01-04 = 674.7 m.

Sumaq, 90 samples taken by Southwestern.

Results :
Sami, DDH # BDSE-01 returned 0.2 g/t Au and 0.2 g/t Ag over a core length of 10.57 m.

Sami, Many Conceptual targets and geophysical targets are not fully tested.

Sumaq, gave up to 0.899 g/t Au. Reported values up to 8.38 g/t Au and >100 g/t Ag. Conceptual targets not drilled.